Checklists
Checklists
Project Checklist without Samples
Project Checklist_Jan2026_MMS-CD
Project Checklist_MMS-PD_Phase A
Project Checklist_Jan2026_MMS_FD_Pre-Phase B
Project Checklist_Jan 2026_MMS-FD_Phase B
Project Checklist_MMS-FD_Pre-PhaseC
Project Checklist _MMS-FD_Phase C
Project Checklist_Jan2026_MMS-FD_Phase D
Project Checklist_Jan2026_MMS-FD_Post-PhaseD
Highway Agency Stormwater General Permit “Phase D” Checklist (provided by NJTA Liaison)
Forms
Forms
Traffic Permit Application Revised 1-2019
NJTA QPL Pilot Form Revised 09-22-2025
Supplementary Products List (SPL Form)
Standard Voltage Drop Computation Form
Fiber Optic Cable Contract Documents Review Certification
Form NJTA-SSS-108A – Steel Price Adjustment Calc during Design
Guidelines
Guides, Guidelines & Guidance
Guidance for Electronic Hard Copy Submittals
Shop Drawing Review Guidelines
Capex & Specifications Design Guidelines
Engineer’s Estimate Update Guidance (provided by NJTA Liaison)
As-Built Plan Preparation Guidelines
Guidelines For Use of VMS Systems for Construction–>Revised 10-05-2020
Templates
Templates
Sample Stakeholder Outreach Plan
Outside Agency Coordination Log Template
Design Decision Report Template
Concept Development Report Template
Preliminary Design Report Template
Preliminary Design Report Template (Maintenance Repair)
Summary of Permit Requirements
Traffic Impact Notices Template