Supplemental Links

Checklists


Checklists

Project Checklist without Samples

Project Checklist_Jan2026_MMS-CD

Project Checklist_MMS-PD_Phase A

Project Checklist_Jan2026_MMS_FD_Pre-Phase B

Project Checklist_Jan 2026_MMS-FD_Phase B

Project Checklist_MMS-FD_Pre-PhaseC

Project Checklist _MMS-FD_Phase C

Project Checklist_Jan2026_MMS-FD_Phase D

Project Checklist_Jan2026_MMS-FD_Post-PhaseD

Highway Agency Stormwater General Permit “Phase D” Checklist (provided by NJTA Liaison)

Forms


Forms

Traffic Permit Application Revised 1-2019

Sign Request Form

NJTA QPL Pilot Form Revised 09-22-2025

Supplementary Products List (SPL Form)

Standard Voltage Drop Computation Form

Fiber Optic Cable Contract Documents Review Certification

Form NJTA-SSS-108A – Steel Price Adjustment Calc during Design

Guidelines


Guides, Guidelines & Guidance

Guidance for Electronic Hard Copy Submittals

Design Exception Guidance

Shop Drawing Review Guidelines

Capex & Specifications Design Guidelines

Engineer’s Estimate Update Guidance (provided by NJTA Liaison)

As-Built Plan Preparation Guidelines

Bridge Inspection Program

Load Rating

Guidelines For Use of VMS Systems for Construction–>Revised 10-05-2020

Road User Cost Manual & Worksheets

Supplemental Sign Policy

Guidance for Electronic NJDEP DLRP Applications

Templates


Templates

CD Report TOC

PD Report TOC

PD Report TOC-Maintenance

Sample Stakeholder Outreach Plan

Outside Agency Coordination Log Template

Design Decision Report Template

Risk Register Template

Concept Development Report Template

Preliminary Design Report Template

Preliminary Design Report Template (Maintenance Repair)

Sample Engineer’s Estimate

Summary of Permit Requirements

Traffic Impact Notices Template

Materials Acceptance Review Matrix Template

Sample Addendum Files

Design Communication Report

Sample Public Involvement Action Plan

Utility Coordination


Utility Coordination

Utility Checklist

Initial Contact Letter

Utility Status Schedule

Sample Utility Checklist

Utility Order

Supplemental Utility Order