Secaucus, NJ
Description
A new bridge will be built and two old bridges removed at the Interchange 17 toll plaza. Other work to be done includes widening the deceleration lane, reconstructing roadside barriers, building stormwater infiltration basins, installing ITS equipment, and resurfacing the roadway.
Schedule
Construction started in November 2024 and is scheduled to be completed in 2029.