Interchange 16W: Replacement of Structure over Berry’s Creek Canal

East Rutherford, NJ

Description

The structure that carries a ramp at Turnpike Interchange 16 over Berry’s Creek Canal is being replaced. The deceleration lane on the mainline is being lengthened, two overhead sign structures are being replaced, and a culvert is being rehabilitated.

Schedule

Construction began in December 2019 and is scheduled to be completed February 2027.