Essex and Hudson Counties, NJ
Description
The Harry Laderman Bridge, which carries the Western Spur over the Passaic River, is being rehabilitated. A partial-depth bridge-deck Latex Modified Concrete overlay will be poured on the Laderman Bridge. In addition, fatigue steel and structural steel repairs will be made and bearings will be replaced. Miscellaneous deck repairs will be made to eight routine bridges nearby, between mileposts 105 and W110, under the same construction contract.
Schedule
Construction began in October of 2024 and is scheduled to be completed in 2028.